In the April edition, the Chart of the Month focuses on the LNG & pipe imports, storage and cross-border Transmission Capacity.
In the view of REPowerEU and the need for increased LNG imports, EU prepares its energy future without Russian gas. New LNG terminals (mostly FSRU) are planned within the next years increasing LNG regasification capacities across EU. LNG imports reached 80 bcm in the EU in 2021 and accounted for 23% of the total NG imports. In Q1 2022, the utilization rates of LNG terminals are significantly higher than the respective ones last year, a trend, which is predicted to be continued during 2022. At the same time, physical bottlenecks (such as limited pipeline interconnections in countries with high LNG import capacity) and reliance on Russian-controlled storage assets have to be resolved.